Kitchen going in!
Kitchen going in!
Kitchen – you can see where the fridge will go.
The sliding door hardware is in and we can month the French Doors in a barn like fashion.
French Doors removed and will be mounted on sliders to add visual interest and safe space
Front porch has been fully sanded.
New lower level stairs.
Lots o wood for framing out the lower level
Lower Level hallway leading to full bath at end.
Standing in Media Room looking at bedroom wall and door opening
Looking into Bedroom which turned out to be a great size
As framing goes in a closet is made for the HVAC air handler
This picture shows the lower level closet and air handler to the left of that is the mud room
Bathtub an dtile in process
Hall bath with “worlds largest niche” going in
Master Bath tile up!
The breakfast bar is ready!
Front of breakfast bar (kitchen side shows the base that was for these narrower wall cabinets to sit on. I am loving the wine rack
Breakfast bar
Kitchen phase II We have appliances!
Looking from old pantry towards from of house.
Hope to have it fully trimmed out with
Wood look ash grey tile 6×24 size –
New beadboard on walls and new 24 inch bead board vanity installed
Master Bath custom vanity
Master bath tile done
Hall bath tile done – penny tile on floor and 12/24 on walls
Lower Level Phase 2 – Media Room
Lower Level Bedroom (with big closet)
Lower Level bathtub is in!
Lower Level Bath – showing the vanity and toilet area going in to the right of tub.
Lower Level – Standing in media room looking towards staircase and the new HVAC air handler in its custom cabinet
The Lower Level Center Hall leading to bathroom at end, door is laundry room on right.
Lower Level – Media Room