A step by step account of 4 months of blood, sweat and maybe some tears.
December 6th – The First Week Of December Is Over With Big Changes
Rear of house with exterior lighting up and running
We have light and electricity. The garage has been fully trimmed out inside, electrified, spots on either eve, and a new cement floor was poured. Pretty nifty. A new garage door will be installed soon.
Layer by layer the old glue and adhesive is coming off the kitchen floors.
Kitchen floor in the process of being sanded
Still can’t believe how good these came out. The right wall will have an entire cabinet wall/fridge/pantry
This anthracite gray vanity will be in the Master Bath and Lower Level Bath
This is the Upstairs Hall Vanity
Half Bath Vanity
Wall tile for hall bath
Floor tiel for hall bath
Nobody believe me when I told them these would come out like this
Master Bedroom Floor
The new staircase leading to the lower level
Lots o wood.
Framing of the basement to create the lower level bedroom which will have a window
Lower level with the floors finally in (bathroom corner of floor)
Framing for the lower level bedroom wall started.
Freshly poured floor on the lower level
and more floor…..we are happy the floor is done 🙂